Wide angle shot showing a coal train passing through the unloading Hopper house 1280x960 EWS66191DidcitPS6x_zoomAngle1stOct03.jpg |
View looking towards Didcot Station 960x1280 DidcotPSCoolingTowersTrackandCreepSignals1stOct03Sept03.jpg |
View from the starting signals outside the hopper house 1280x960 EWS66065EnteringHopperHouseCabView3rdOct03.jpg |
Unloading coal from the trains is carried to the top of the conveyer and drops to form a 'volcanic' heap the dispersed by the Spreader Dumpers 1280x960 DidcotPSCoalConvayors_2_.jpg |
Top Loading. Takes place when a certain type of coal has to be separated and mixed with the main coal heap by the Spreader Dumpers 960x1280 SpreaderDumperOnCoalLHeap_b_3rdOct03.jpg |
Three Spreader Dumpers wait for the coal to start pouring into their hoppers 1280x960 SpreaderDumperOnCoalLHeap_d_3rdOct03.jpg |
The Outgoing empty train waits at the exit signal for an incoming loaded coal trian to clear the Up Loop. The loco has just run around the train at Didcot and is now pulling towards the power station and will cross in front of the empty coal train at the crossover just ahead 1280x960 WaitingAtDidcotPSExitSignalOct03.jpg |
The noise and force of the hot water changes according to the peak hours of use 1280x960 DidcotPSCoolingTowerBase_f_1stOct03.jpg |
The new coal for mixing is directed from the hoppers and loaded into the Spreader Dumpers 960x1280 SpreaderDumperOnCoalLHeap_e_3rdOct03.jpg |
The Locomotive has just entered the hopper house 1280x960 EWS66065InsideHopperHouseCabView3rdOct03.jpg |
The locomotive exits from the east end of the hopper house 1280x960 EWS66065DepartingHopperHouseCabView3rdOct03.jpg |
The Loco of the loaded coal train from Avonmouth Docks has runround at Didcot and is waiting to enter the Power Station for unloading 1280x960 EWS66181FoxhallUpLoop_B_1stOct03.jpg |
The Loco of the loaded coal train from Avonmouth Docks has runround at Didcot and is waiting to enter the Power Station for unloading 1280x960 EWS66181FoxhallUpLoop_A_1stOct03.jpg |
The high temperature water from the generating plant is forced into and around the cooling towers and under gravity begins it's cooling before returning to the river Thames 960x1280 DidcotPSCoolingTowerBase_d_1stOct03.jpg |
The coal trian is approximately half way through the unloadong house 960x1280 EWS66181DidcotPS_18_1stOct03.jpg |
The Class 37 had arrived light engine to pick up empty coal wagons left over the weekend before 965x1409 Class37DidcotPS.JPG.jpg |
Telephotos picture, cropped to cut out the less interesting foreground 1276x696 EWS66191DidcotPS_6xZoomM_1stOct03.jpg |
Rear of a coal train in it's final unloading stage on No2 road in the hopper house 1246x912 DidcotPSTailendOfCoalTrainGoingThroughUnloadingHoppersOct3rd03.jpg |
Moving towards the hopper house 917x1242 DidcotPSUnloadingHoppers_1_Oct03.jpg |
Loaded coal train waits at the main signal gantry to pull round to the unloading plant 1280x960 EWS66181DidcotPSArrival_d_Oct03.jpg |
Loaded coal train waits at the main signal gantry to pull round to the unloading plant 960x1280 EWS66181DidcotPSArrival_c_Oct03.jpg |
Loaded coal train waits at the main signal gantry to pull round to the unloading plant 1280x960 EWS66181DidcotPSArrival_b_Oct03.jpg |
Loaded coal train waits at the main signal gantry to pull round to the unloading plant 1280x960 EWS66181DidcotPSArrival_a_Oct03.jpg |
Even the large coal trains and locomotives are dwarfed by the scale of the Cooling Towers 960x1280 EWS66181DidcotPS_17_1stOct03.jpg |
Didcot train crews have been working the coal trains from the first day of opening. This is an early (1973) photo of that period 1727x1121 DidcotPowerStationInTheEarly70_s.jpg |
Coal trains can move through the plant none-stop, at 0.5mph. but ocassionally have to stop to allow the underground hoppers to clear a bit 1280x960 EWS66181DidcotPS_13_1stOct03.jpg |
Cab view of the cooling towers and creep signals 1280x960 DidcotPSDriver_sView_a_60783_Sept03.jpg |
Cab view from No. 1 road and the creep signals 1280x960 DidcotPSDriver_sView_b_60783_Sept03.jpg |
An HST runs past as the coal trainw aits for the signal to enter the power station for unloading 1280x960 EWS66015DidcotPSWithHSTOnDownMainOct03.jpg |
Along with gravity water is also forced through a large pipe and 'flutes' that help break the flow into drops 1280x960 DidcotPSCoolingTowerBase_e_1stOct03.jpg |
A Spreadrer Dumper clears the coal from the flutted shute. The 'flutes' allow the coal to pour evenly around and in a uniform heap 960x1280 SpreaderDumperOnCoalLHeap_j_3rdOct03.jpg |
A Spreader Dumper returning for a reload 1280x960 SpreaderDumperOnCoalLHeap_g_3rdOct03.jpg |
A quiet moment when no water is running 960x1280 DidcotPSCoolingTowerBase_b_1stOct03.jpg |
A pleasant sunrise after a very cold night when water lying around was still frozen 2265x1612 DidcotPSCoalDumpSunrise1980s.jpg |
A First HST passes on the down main while the empty coal train waits for a loaded train to clear the Up loop 1296x966 WaitingAtPowerStationExitSignalAnd1st180OnDownMainOct03.jpg |
A Dumper spreads the newer coal to mix in with the main heap 1280x960 SpreaderDumperOnCoalLHeap_a_3rdOct03.jpg |
A cropped image giving a widescreen effect 1144x250 EWS66228DidcotPStation_24_3rdOct03.jpg |
A coal train creeps along discharging coal on No. 2 road. The yellow 'Daleks' are only used for the older Merrygoround wagons. The new EWS 100tonn wagons are unloaded manually by power station staff as the train creeps along 1280x960 DidcotPSUnloadingHoppers_2_Oct03.jpg |
A 6xZoom view of the chimney and side of one cooling tower 960x1280 DidcotPSChimneyandCoolingTower.jpg |
1280x960 SpreaderDumperOnCoalLHeap_f_3rdOct03.jpg |
1280x960 EWS66117DidcotPS_21_1stOct03.jpg |
960x1280 EWS66065DidcotPS_25_1stOct03.jpg |
1433x933 58020DidcotPS1980_sb.jpg |
1280x960 EWS66181DidcotPS_19_1stOct03.jpg |
1280x960 EWS66181DidcotPS_15_1stOct03.jpg |
1280x960 EWS66078DidcotPS_24_1stOct03.jpg |
960x1280 EWS66078DidcotPS_20_1stOct03.jpg |
1280x960 EWS66065DidcotPS_10_1stOct03.jpg |
1280x960 Didcot_PS_CoalTrain_6D17_Oct03.jpg |
1280x960 SpreaderDumperOnCoalLHeap_i_3rdOct03.jpg |
1280x960 DidcotPSCoolingTowerBase_c_1stOct03.jpg |
2437x1589 58017DidcotP.S.1980_S.jpg |
1280x960 DidcotPSCoalConvayors_3_.jpg |
1280x960 EWS66015DidcotPS1stOct03.jpg |
960x1280 EWS66181DidcotPS_13b_1stOct03.jpg |
1280x960 EWS66181DidcotPS_14_1stOct03.jpg |
1280x960 EWS66117_DidcotPSCoolingTowers_12_1stOct03.jpg |
1280x960 SpreaderDumperOnCoalLHeap_h_3rdOct03.jpg |
960x1280 EWS66117DidcotPS_23_1stOct03.jpg |
1246x914 DidcotPSGenetartingPlantandChimneyI1stOct03.jpg |
| | | |